    Amendment C167mith implements the recommendations of Council's Rural Land and Activities Review 2022 into the Mitchell Planning Scheme. The amendment provides a clearer planning framework for rural land that:  

    • Protects productive agricultural land from inappropriate fragmentation.  

    • Supports ongoing farming and agricultural investment.  

    • Encourages rural tourism and agriculture-related businesses.  

    • Recognises the different characteristics and opportunities across Mitchell's rural areas.  

    • Supports long-term agricultural productivity and environmental sustainability.  

     

    The amendment gives effect to Council's long-term vision for rural land by updating the Municipal Planning Strategy and Planning Policy Framework, replacing the existing Schedule to the Farming Zone with three new schedules, and including the Rural Land and Activities Review 2022 in the Mitchell Planning Scheme as a Background Document.  

    What is the Rural Land and Activities Review?

    The Mitchell Rural Land and Activities Review (RLAR) 2022 provides a strategic framework for the future use, development and management of rural land across Mitchell Shire. The review was undertaken to ensure planning controls continue to support agriculture, protect productive farming land and respond to changing economic, environmental and development pressures. The Draft RLAR was publicly consulted on between February and June 2021 and was subsequently adopted by Council in December 2022. Following community and stakeholder consultation, the review recommended changes to the Mitchell Planning Scheme and identified three broad policy areas to guide future planning decisions for rural land:  

     

    • Policy Area 1 focuses on protecting the shire's most productive and least fragmented farming land. It recommended an 80-hectare minimum subdivision size and an 80-hectare minimum lot size for a dwelling without a permit through a new Farming Zone Schedule 1.  

    • Policy Area 2 supports a mix of agricultural, environmental and rural living activities. It recommended a 40-hectare minimum subdivision size and a 40-hectare minimum lot size for a dwelling without a permit through a new Farming Zone Schedule 2.  

    • Policy Area 3 applies to land influenced by urban growth and major transport corridors. While recognising these pressures, it continues to support productive rural land uses and recommended a 40-hectare minimum subdivision size and 40-hectare minimum lot size for a dwelling without a permit through Farming Zone Schedule 2.  

     

    Amendment C167mith implements the key recommendations of the RLAR by introducing revised rural planning controls and local policy provisions for rural land across Mitchell Shire.  

    Is my property being rezoned?

    The amendment does not propose to rezone any rural land. Existing rural zones, including the Farming Zone (FZ) and Rural Conservation Zone (RCZ), will remain in place. Instead, the amendment proposes three new schedules to the Farming Zone and updates local planning policies to guide decisions relating to dwellings, subdivision and non-agricultural uses in rural areas. 

    What is Farming Zone 1?

    For land within Farming Zone Schedule 1 (Seymour), the amendment proposes, in summary:  

    • Retain the minimum subdivision size of 80 hectares.  

    • Increase the minimum lot size at which a dwelling may be constructed without a permit to 80 hectares, from 40 hectares.  

    For land within Farming Zone Schedule 1 (Pyalong and Tooborac), the amendment proposes, in summary:  

    • Increase the minimum subdivision size to 80 hectares, from 40 hectares.  

    • Increase the minimum lot size at which a dwelling may be constructed without a permit to 80 hectares, from 40 hectares.  

    What is Farming Zone 2?

    For land within Farming Zone Schedule 2, the amendment proposes, in summary:  

    • Minimum subdivision size of 40 hectares.  

    • Minimum lot size of 40 hectares at which a dwelling may be constructed without a permit.  

    For most land in Schedule 2, existing controls are unchanged by the proposed Amendment. However, there is a small area of Farming Zone in Broadford (land south of Broadford bounded by the railway, Broadford-Wallan Road and the Rural Living Zone to the south – see Figure 2 below) where the current minimum subdivision size is 20 hectares and this is proposed to be increased to 40 hectares.  

    What is Farming Zone 3?

    Farming Zone Schedule 3 applies to land within the Urban Growth Boundary. In summary, the Amendment proposes the following provisions (which are unchanged from the current unnumbered Schedule to the Farming Zone):  

    • Minimum subdivision size of 40 hectares.  

    • Minimum lot size of 40 hectares at which a dwelling may be constructed without a permit.